Scooter Clutch for Yamaha WR250: Folding Type
This scooter clutch is built for the Yamaha WR250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the folding type programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Scooter Clutch |
|---|---|
| Fitment | Yamaha WR250 |
| Version | Folding Type |
| Base material | Semi-Metallic Compound |
| Typical use | Coastal Delivery |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Semi-Metallic Compound is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha WR250 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- sintering
- anodising
- ultrasonic cleaning
- powder coating
- precision stamping
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The folding type build is the one most often ordered for coastal delivery. Riders also fit it for long-distance touring, farm use, food delivery, off-road trails.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







