Welcome to Auto, Motorcycle Parts & Accessories official website!
Side Stand for Bajaj CT100: Off-Road Version

Side Stand for Bajaj CT100: Off-Road Version

Side Stand for Bajaj CT100: Off-Road VersionThis side stand is built for the Bajaj CT100 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Side Stand for Bajaj CT100: Off-Road Version

This side stand is built for the Bajaj CT100 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the off-road version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Side Stand for Bajaj CT100

Specification

PartSide Stand
FitmentBajaj CT100
VersionOff-Road Version
Base materialBronze
Typical useFood Delivery
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time25-45 days after approval
ComplianceDOT

What decides whether it lasts

  • Material — Bronze is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Bajaj CT100 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Side Stand production

Processes used on this line

  • heat treatment
  • surface grinding
  • cold forging
  • anodising
  • die casting
  • injection moulding

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The off-road version build is the one most often ordered for food delivery. Riders also fit it for adventure travel, passenger transport, mountain roads, rural transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top