Air Box for Bajaj Dominar 400: Budget Line
This air box is built for the Bajaj Dominar 400 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Air Box |
|---|---|
| Fitment | Bajaj Dominar 400 |
| Version | Budget Line |
| Base material | EPDM Rubber |
| Typical use | Track Days |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — EPDM Rubber is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj Dominar 400 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- CNC machining
- cold forging
- robot welding
- heat treatment
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The budget line build is the one most often ordered for track days. Riders also fit it for construction sites, heavy load hauling, roadside assistance, long-distance touring.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







