Piston Kit for Honda CB Shine: Load Rated Version
This piston kit is built for the Honda CB Shine and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the load rated version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: reorders that did not match the approved sample, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Piston Kit |
|---|---|
| Fitment | Honda CB Shine |
| Version | Load Rated Version |
| Base material | Nylon 66 |
| Typical use | Farm Use |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Nylon 66 is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda CB Shine mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- injection moulding
- rubber vulcanisation
- cold forging
- laser cutting
- die casting
- surface grinding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The load rated version build is the one most often ordered for farm use. Riders also fit it for construction sites, weekend riding, daily commuting, mining sites.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







