Welcome to Auto, Motorcycle Parts & Accessories official website!
Seat for Honda CRF250: Upgraded Version

Seat for Honda CRF250: Upgraded Version

Seat for Honda CRF250: Upgraded VersionThis seat is built for the Honda CRF250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Seat for Honda CRF250: Upgraded Version

This seat is built for the Honda CRF250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: packing that arrived crushed at the port, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Seat for Honda CRF250

Specification

PartSeat
FitmentHonda CRF250
VersionUpgraded Version
Base materialMagnesium Alloy
Typical useRental Fleets
MOQ200 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time30-60 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — Magnesium Alloy is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda CRF250 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Seat production

Processes used on this line

  • sintering
  • heat treatment
  • anodising
  • die casting
  • laser cutting
  • ultrasonic cleaning

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The upgraded version build is the one most often ordered for rental fleets. Riders also fit it for construction sites, food delivery, mountain roads, night riding.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top