Shock Spring for Honda CRF250: High Performance
This shock spring is built for the Honda CRF250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Shock Spring |
|---|---|
| Fitment | Honda CRF250 |
| Version | High Performance |
| Base material | EPDM Rubber |
| Typical use | Motocross |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — EPDM Rubber is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda CRF250 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- CNC machining
- powder coating
- die casting
- gravity casting
- injection moulding
- anodising
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The high performance build is the one most often ordered for motocross. Riders also fit it for adventure travel, airport ground fleets, weekend riding, daily commuting.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







