Roller Set for Bajaj Dominar 400: Folding Type
This roller set is built for the Bajaj Dominar 400 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the folding type programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Roller Set |
|---|---|
| Fitment | Bajaj Dominar 400 |
| Version | Folding Type |
| Base material | Titanium Alloy |
| Typical use | Wet Weather Riding |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | REACH |
What decides whether it lasts
- Material — Titanium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj Dominar 400 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- surface grinding
- injection moulding
- ultrasonic cleaning
- heat treatment
- gravity casting
- CNC machining
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The folding type build is the one most often ordered for wet weather riding. Riders also fit it for weekend riding, coastal delivery, passenger transport, long-distance touring.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







