Welcome to Auto, Motorcycle Parts & Accessories official website!
Header Pipe for Yamaha NMAX155: Two-Piece Construction

Header Pipe for Yamaha NMAX155: Two-Piece Construction

Header Pipe for Yamaha NMAX155: Two-Piece ConstructionThis header pipe is built for the Yamaha NMAX155 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Header Pipe for Yamaha NMAX155: Two-Piece Construction

This header pipe is built for the Yamaha NMAX155 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Header Pipe for Yamaha NMAX155

Specification

PartHeader Pipe
FitmentYamaha NMAX155
VersionTwo-Piece Construction
Base materialPU Leather
Typical usePassenger Transport
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time25-60 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — PU Leather is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha NMAX155 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Header Pipe production

Processes used on this line

  • heat treatment
  • assembly line testing
  • rubber vulcanisation
  • die casting
  • injection moulding
  • gravity casting

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The two-piece construction build is the one most often ordered for passenger transport. Riders also fit it for construction sites, heavy load hauling, airport ground fleets, urban courier work.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top