Welcome to Auto, Motorcycle Parts & Accessories official website!
Air Box for KTM RC 390: Vented Design

Air Box for KTM RC 390: Vented Design

Air Box for KTM RC 390: Vented DesignThis air box is built for the KTM RC 390 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Air Box for KTM RC 390: Vented Design

This air box is built for the KTM RC 390 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Air Box for KTM RC 390

Specification

PartAir Box
FitmentKTM RC 390
VersionVented Design
Base materialChromed Steel
Typical useTrack Days
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time30-60 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual KTM RC 390 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Air Box production

Processes used on this line

  • surface grinding
  • precision stamping
  • shot blasting
  • robot welding
  • sintering
  • CNC machining

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The vented design build is the one most often ordered for track days. Riders also fit it for off-road trails, ride-hailing fleets, wet weather riding, construction sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top