Welcome to Auto, Motorcycle Parts & Accessories official website!
Mudguard for Aprilia RS 125: Two-Piece Construction

Mudguard for Aprilia RS 125: Two-Piece Construction

Mudguard for Aprilia RS 125: Two-Piece ConstructionThis mudguard is built for the Aprilia RS 125 and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Mudguard for Aprilia RS 125: Two-Piece Construction

This mudguard is built for the Aprilia RS 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Mudguard for Aprilia RS 125

Specification

PartMudguard
FitmentAprilia RS 125
VersionTwo-Piece Construction
Base materialChromed Steel
Typical useFarm Use
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time30-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Aprilia RS 125 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Mudguard production

Processes used on this line

  • injection moulding
  • anodising
  • powder coating
  • shot blasting
  • surface grinding
  • electroplating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The two-piece construction build is the one most often ordered for farm use. Riders also fit it for ride-hailing fleets, rental fleets, mining sites, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top