Welcome to Auto, Motorcycle Parts & Accessories official website!
Side Stand for Suzuki GS125: OEM Replacement

Side Stand for Suzuki GS125: OEM Replacement

Side Stand for Suzuki GS125: OEM ReplacementThis side stand is built for the Suzuki GS125 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Side Stand for Suzuki GS125: OEM Replacement

This side stand is built for the Suzuki GS125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Side Stand for Suzuki GS125

Specification

PartSide Stand
FitmentSuzuki GS125
VersionOEM Replacement
Base materialCarbon Fibre Composite
Typical usePassenger Transport
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time20-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Carbon Fibre Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Suzuki GS125 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Side Stand production

Processes used on this line

  • gravity casting
  • robot welding
  • surface grinding
  • shot blasting
  • powder coating
  • die casting

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The oem replacement build is the one most often ordered for passenger transport. Riders also fit it for rental fleets, coastal delivery, ride-hailing fleets, mining sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top