Kickstart Lever for Honda CRF250: Waterproof Version
This kickstart lever is built for the Honda CRF250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the waterproof version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Kickstart Lever |
|---|---|
| Fitment | Honda CRF250 |
| Version | Waterproof Version |
| Base material | Zinc Plated Steel |
| Typical use | Food Delivery |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda CRF250 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- robot welding
- electroplating
- assembly line testing
- die casting
- anodising
- injection moulding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The waterproof version build is the one most often ordered for food delivery. Riders also fit it for airport ground fleets, motocross, mountain roads, weekend riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







