Welcome to Auto, Motorcycle Parts & Accessories official website!
Turn Signal for Honda ADV160: Vented Design

Turn Signal for Honda ADV160: Vented Design

Turn Signal for Honda ADV160: Vented DesignThis turn signal is built for the Honda ADV160 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Turn Signal for Honda ADV160: Vented Design

This turn signal is built for the Honda ADV160 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Turn Signal for Honda ADV160

Specification

PartTurn Signal
FitmentHonda ADV160
VersionVented Design
Base materialReinforced Nylon
Typical useRural Transport
MOQ3,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time25-45 days after approval
ComplianceE-mark

What decides whether it lasts

  • Material — Reinforced Nylon is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda ADV160 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Turn Signal production

Processes used on this line

  • injection moulding
  • gravity casting
  • ultrasonic cleaning
  • electroplating
  • assembly line testing
  • die casting

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The vented design build is the one most often ordered for rural transport. Riders also fit it for heavy load hauling, mountain roads, ride-hailing fleets, daily commuting.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top