Welcome to Auto, Motorcycle Parts & Accessories official website!
Kickstart Lever for Aprilia RS 125: Sealed Unit

Kickstart Lever for Aprilia RS 125: Sealed Unit

Kickstart Lever for Aprilia RS 125: Sealed UnitThis kickstart lever is built for the Aprilia RS 125 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Kickstart Lever for Aprilia RS 125: Sealed Unit

This kickstart lever is built for the Aprilia RS 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a supplier who changed material without saying so, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Kickstart Lever for Aprilia RS 125

Specification

PartKickstart Lever
FitmentAprilia RS 125
VersionSealed Unit
Base materialKevlar Composite
Typical useOff-Road Trails
MOQ1,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time30-45 days after approval
ComplianceTUV

What decides whether it lasts

  • Material — Kevlar Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Aprilia RS 125 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Kickstart Lever production

Processes used on this line

  • die casting
  • precision stamping
  • shot blasting
  • surface grinding
  • injection moulding
  • rubber vulcanisation

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The sealed unit build is the one most often ordered for off-road trails. Riders also fit it for weekend riding, airport ground fleets, delivery fleets, coastal delivery.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top