Welcome to Auto, Motorcycle Parts & Accessories official website!
Crash Bar for GasGas EC 250: Two-Piece Construction

Crash Bar for GasGas EC 250: Two-Piece Construction

Crash Bar for GasGas EC 250: Two-Piece ConstructionThis crash bar is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Crash Bar for GasGas EC 250: Two-Piece Construction

This crash bar is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Crash Bar for GasGas EC 250

Specification

PartCrash Bar
FitmentGasGas EC 250
VersionTwo-Piece Construction
Base materialAluminium Alloy
Typical useMountain Roads
MOQ1,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time30-60 days after approval
ComplianceSAE J431

What decides whether it lasts

  • Material — Aluminium Alloy is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual GasGas EC 250 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Crash Bar production

Processes used on this line

  • electroplating
  • injection moulding
  • surface grinding
  • die casting
  • robot welding
  • gravity casting

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for mountain roads. Riders also fit it for airport ground fleets, delivery fleets, roadside assistance, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top