Oil Cooler for Bajaj Dominar 400: Budget Line
This oil cooler is built for the Bajaj Dominar 400 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Oil Cooler |
|---|---|
| Fitment | Bajaj Dominar 400 |
| Version | Budget Line |
| Base material | Neoprene |
| Typical use | Roadside Assistance |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | CCC |
What decides whether it lasts
- Material — Neoprene is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj Dominar 400 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- robot welding
- surface grinding
- shot blasting
- anodising
- heat treatment
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The budget line build is the one most often ordered for roadside assistance. Riders also fit it for farm use, coastal delivery, security patrols, weekend riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.






