CDI Unit for Royal Enfield Classic 350: Drilled and Slotted
This cdi unit is built for the Royal Enfield Classic 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | CDI Unit |
|---|---|
| Fitment | Royal Enfield Classic 350 |
| Version | Drilled and Slotted |
| Base material | ABS Plastic |
| Typical use | Construction Sites |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | SGS |
What decides whether it lasts
- Material — ABS Plastic is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Classic 350 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- rubber vulcanisation
- assembly line testing
- injection moulding
- heat treatment
- shot blasting
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The drilled and slotted build is the one most often ordered for construction sites. Riders also fit it for heavy load hauling, rural transport, roadside assistance, off-road trails.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







