Welcome to Auto, Motorcycle Parts & Accessories official website!
Mudguard for Dayun 150: Two-Piece Construction

Mudguard for Dayun 150: Two-Piece Construction

Mudguard for Dayun 150: Two-Piece ConstructionThis mudguard is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Mudguard for Dayun 150: Two-Piece Construction

This mudguard is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Mudguard for Dayun 150

Specification

PartMudguard
FitmentDayun 150
VersionTwo-Piece Construction
Base materialForged Aluminium
Typical useFarm Use
MOQ3,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time30-60 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — Forged Aluminium is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Mudguard production

Processes used on this line

  • shot blasting
  • die casting
  • sintering
  • anodising
  • cold forging
  • powder coating

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The two-piece construction build is the one most often ordered for farm use. Riders also fit it for food delivery, passenger transport, daily commuting, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top