Engine Guard for KTM EXC 300: Long Life Version
This engine guard is built for the KTM EXC 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the long life version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Engine Guard |
|---|---|
| Fitment | KTM EXC 300 |
| Version | Long Life Version |
| Base material | Aluminium Alloy |
| Typical use | Motocross |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | REACH |
What decides whether it lasts
- Material — Aluminium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual KTM EXC 300 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- powder coating
- electroplating
- die casting
- precision stamping
- sintering
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The long life version build is the one most often ordered for motocross. Riders also fit it for daily commuting, heavy load hauling, farm use, adventure travel.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







