Speedometer for Royal Enfield Classic 350: Waterproof Version
This speedometer is built for the Royal Enfield Classic 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the waterproof version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Speedometer |
|---|---|
| Fitment | Royal Enfield Classic 350 |
| Version | Waterproof Version |
| Base material | PU Leather |
| Typical use | Off-Road Trails |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — PU Leather is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Classic 350 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- rubber vulcanisation
- electroplating
- heat treatment
- laser cutting
- CNC machining
- shot blasting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The waterproof version build is the one most often ordered for off-road trails. Riders also fit it for security patrols, delivery fleets, ride-hailing fleets, coastal delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







