Welcome to Auto, Motorcycle Parts & Accessories official website!
Top Box for Honda CG125: Heavy Duty

Top Box for Honda CG125: Heavy Duty

Top Box for Honda CG125: Heavy DutyThis top box is built for the Honda CG125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Top Box for Honda CG125: Heavy Duty

This top box is built for the Honda CG125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the heavy duty programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Top Box for Honda CG125

Specification

PartTop Box
FitmentHonda CG125
VersionHeavy Duty
Base materialChromed Steel
Typical useTrack Days
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-35 days after approval
ComplianceDOT

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda CG125 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Top Box production

Processes used on this line

  • electroplating
  • robot welding
  • anodising
  • laser cutting
  • gravity casting
  • rubber vulcanisation

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The heavy duty build is the one most often ordered for track days. Riders also fit it for urban courier work, mining sites, roadside assistance, rural transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top