Brake Pad for Lifan 110: Load Rated Version
This brake pad is built for the Lifan 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the load rated version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Brake Pad |
|---|---|
| Fitment | Lifan 110 |
| Version | Load Rated Version |
| Base material | Aluminium Alloy |
| Typical use | Daily Commuting |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-35 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Aluminium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Lifan 110 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- rubber vulcanisation
- assembly line testing
- shot blasting
- die casting
- injection moulding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The load rated version build is the one most often ordered for daily commuting. Riders also fit it for track days, adventure travel, construction sites, motocross.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







