Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Tap for BMW G 310 R: Sealed Unit

Fuel Tap for BMW G 310 R: Sealed Unit

Fuel Tap for BMW G 310 R: Sealed UnitThis fuel tap is built for the BMW G 310 R and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Fuel Tap for BMW G 310 R: Sealed Unit

This fuel tap is built for the BMW G 310 R and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fuel Tap for BMW G 310 R

Specification

PartFuel Tap
FitmentBMW G 310 R
VersionSealed Unit
Base materialZinc Plated Steel
Typical useWet Weather Riding
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-45 days after approval
ComplianceCCC

What decides whether it lasts

  • Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual BMW G 310 R mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fuel Tap production

Processes used on this line

  • rubber vulcanisation
  • gravity casting
  • laser cutting
  • robot welding
  • sintering
  • assembly line testing

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The sealed unit build is the one most often ordered for wet weather riding. Riders also fit it for roadside assistance, weekend riding, off-road trails, coastal delivery.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top