Carburetor Repair Kit for KTM EXC 300: Off-Road Version
This carburetor repair kit is built for the KTM EXC 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the off-road version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Carburetor Repair Kit |
|---|---|
| Fitment | KTM EXC 300 |
| Version | Off-Road Version |
| Base material | Chromed Steel |
| Typical use | Track Days |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Chromed Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual KTM EXC 300 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- gravity casting
- injection moulding
- robot welding
- anodising
- ultrasonic cleaning
- surface grinding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The off-road version build is the one most often ordered for track days. Riders also fit it for long-distance touring, daily commuting, weekend riding, rural transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







