Clutch Cable for Sherco 300: OEM Replacement
This clutch cable is built for the Sherco 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Clutch Cable |
|---|---|
| Fitment | Sherco 300 |
| Version | OEM Replacement |
| Base material | Reinforced Nylon |
| Typical use | Weekend Riding |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Reinforced Nylon is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Sherco 300 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- heat treatment
- surface grinding
- robot welding
- CNC machining
- precision stamping
- powder coating
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The oem replacement build is the one most often ordered for weekend riding. Riders also fit it for mountain roads, long-distance touring, farm use, roadside assistance.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







