Welcome to Auto, Motorcycle Parts & Accessories official website!
Oil Cooler for Harley-Davidson Street 750: Budget Line

Oil Cooler for Harley-Davidson Street 750: Budget Line

Oil Cooler for Harley-Davidson Street 750: Budget LineThis oil cooler is built for the Harley-Davidson Street 750 and supplied to a written specification, so the part that comes off the line in the.

Contact Number:
Product Details

Oil Cooler for Harley-Davidson Street 750: Budget Line

This oil cooler is built for the Harley-Davidson Street 750 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: packing that arrived crushed at the port, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Oil Cooler for Harley-Davidson Street 750

Specification

PartOil Cooler
FitmentHarley-Davidson Street 750
VersionBudget Line
Base materialBrass
Typical useCoastal Delivery
MOQ1,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — Brass is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Harley-Davidson Street 750 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Oil Cooler production

Processes used on this line

  • CNC machining
  • heat treatment
  • electroplating
  • rubber vulcanisation
  • ultrasonic cleaning
  • robot welding

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The budget line build is the one most often ordered for coastal delivery. Riders also fit it for adventure travel, construction sites, mining sites, daily commuting.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top