Welcome to Auto, Motorcycle Parts & Accessories official website!
Camshaft for Yamaha Ténéré 700: Two-Piece Construction

Camshaft for Yamaha Ténéré 700: Two-Piece Construction

Camshaft for Yamaha Ténéré 700: Two-Piece ConstructionThis camshaft is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Camshaft for Yamaha Ténéré 700: Two-Piece Construction

This camshaft is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Camshaft for Yamaha Ténéré 700

Specification

PartCamshaft
FitmentYamaha Ténéré 700
VersionTwo-Piece Construction
Base materialCeramic Composite
Typical useMotocross
MOQ1,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time25-45 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — Ceramic Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha Ténéré 700 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Camshaft production

Processes used on this line

  • CNC machining
  • injection moulding
  • precision stamping
  • laser cutting
  • assembly line testing
  • powder coating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The two-piece construction build is the one most often ordered for motocross. Riders also fit it for mountain roads, mining sites, motocross, roadside assistance.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top