Welcome to Auto, Motorcycle Parts & Accessories official website!
Speedometer for Lifan 110: High Performance

Speedometer for Lifan 110: High Performance

Speedometer for Lifan 110: High PerformanceThis speedometer is built for the Lifan 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Speedometer for Lifan 110: High Performance

This speedometer is built for the Lifan 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Speedometer for Lifan 110

Specification

PartSpeedometer
FitmentLifan 110
VersionHigh Performance
Base materialChromed Steel
Typical useUrban Courier Work
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time25-35 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Lifan 110 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Speedometer production

Processes used on this line

  • gravity casting
  • robot welding
  • powder coating
  • laser cutting
  • die casting
  • rubber vulcanisation

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The high performance build is the one most often ordered for urban courier work. Riders also fit it for airport ground fleets, off-road trails, mountain roads, coastal delivery.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top