Welcome to Auto, Motorcycle Parts & Accessories official website!
Relay for BMW R1250GS: Drilled and Slotted

Relay for BMW R1250GS: Drilled and Slotted

Relay for BMW R1250GS: Drilled and SlottedThis relay is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Relay for BMW R1250GS: Drilled and Slotted

This relay is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: reorders that did not match the approved sample, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Relay for BMW R1250GS

Specification

PartRelay
FitmentBMW R1250GS
VersionDrilled and Slotted
Base materialNeoprene
Typical useRural Transport
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-45 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — Neoprene is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual BMW R1250GS mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Relay production

Processes used on this line

  • heat treatment
  • powder coating
  • CNC machining
  • electroplating
  • sintering
  • laser cutting

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The drilled and slotted build is the one most often ordered for rural transport. Riders also fit it for security patrols, coastal delivery, motocross, airport ground fleets.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top