Welcome to Auto, Motorcycle Parts & Accessories official website!
Throttle Cable for Suzuki DR200: Off-Road Version

Throttle Cable for Suzuki DR200: Off-Road Version

Throttle Cable for Suzuki DR200: Off-Road VersionThis throttle cable is built for the Suzuki DR200 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Throttle Cable for Suzuki DR200: Off-Road Version

This throttle cable is built for the Suzuki DR200 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the off-road version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Throttle Cable for Suzuki DR200

Specification

PartThrottle Cable
FitmentSuzuki DR200
VersionOff-Road Version
Base materialCarbon Fibre Composite
Typical useNight Riding
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-60 days after approval
ComplianceECE R90

What decides whether it lasts

  • Material — Carbon Fibre Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Suzuki DR200 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Throttle Cable production

Processes used on this line

  • electroplating
  • precision stamping
  • cold forging
  • assembly line testing
  • CNC machining
  • powder coating

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The off-road version build is the one most often ordered for night riding. Riders also fit it for delivery fleets, passenger transport, security patrols, farm use.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top