Welcome to Auto, Motorcycle Parts & Accessories official website!
Speedometer Cable for Suzuki GSX-R600: Two-Piece Construction

Speedometer Cable for Suzuki GSX-R600: Two-Piece Construction

Speedometer Cable for Suzuki GSX-R600: Two-Piece ConstructionThis speedometer cable is built for the Suzuki GSX-R600 and supplied to a written specification, so the part that comes off the line in.

Contact Number:
Product Details

Speedometer Cable for Suzuki GSX-R600: Two-Piece Construction

This speedometer cable is built for the Suzuki GSX-R600 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Speedometer Cable for Suzuki GSX-R600

Specification

PartSpeedometer Cable
FitmentSuzuki GSX-R600
VersionTwo-Piece Construction
Base materialNylon 66
Typical useTrack Days
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-60 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — Nylon 66 is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Suzuki GSX-R600 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Speedometer Cable production

Processes used on this line

  • CNC machining
  • laser cutting
  • injection moulding
  • electroplating
  • ultrasonic cleaning
  • powder coating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The two-piece construction build is the one most often ordered for track days. Riders also fit it for construction sites, mining sites, weekend riding, airport ground fleets.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top