Welcome to Auto, Motorcycle Parts & Accessories official website!
Speedometer Cable for BMW R1250GS: High Performance

Speedometer Cable for BMW R1250GS: High Performance

Speedometer Cable for BMW R1250GS: High PerformanceThis speedometer cable is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Speedometer Cable for BMW R1250GS: High Performance

This speedometer cable is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Speedometer Cable for BMW R1250GS

Specification

PartSpeedometer Cable
FitmentBMW R1250GS
VersionHigh Performance
Base materialKevlar Composite
Typical useCoastal Delivery
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time30-45 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — Kevlar Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual BMW R1250GS mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Speedometer Cable production

Processes used on this line

  • gravity casting
  • CNC machining
  • anodising
  • heat treatment
  • cold forging
  • shot blasting

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The high performance build is the one most often ordered for coastal delivery. Riders also fit it for passenger transport, delivery fleets, track days, construction sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top