Welcome to Auto, Motorcycle Parts & Accessories official website!
Spark Plug for Shineray XY125: Two-Piece Construction

Spark Plug for Shineray XY125: Two-Piece Construction

Spark Plug for Shineray XY125: Two-Piece ConstructionThis spark plug is built for the Shineray XY125 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Spark Plug for Shineray XY125: Two-Piece Construction

This spark plug is built for the Shineray XY125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Spark Plug for Shineray XY125

Specification

PartSpark Plug
FitmentShineray XY125
VersionTwo-Piece Construction
Base materialKevlar Composite
Typical useMining Sites
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time30-60 days after approval
ComplianceSGS

What decides whether it lasts

  • Material — Kevlar Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Shineray XY125 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Spark Plug production

Processes used on this line

  • sintering
  • die casting
  • electroplating
  • precision stamping
  • assembly line testing
  • CNC machining

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for mining sites. Riders also fit it for mining sites, delivery fleets, wet weather riding, farm use.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top