Welcome to Auto, Motorcycle Parts & Accessories official website!
Header Pipe for Yamaha Ténéré 700: Low Maintenance Version

Header Pipe for Yamaha Ténéré 700: Low Maintenance Version

Header Pipe for Yamaha Ténéré 700: Low Maintenance VersionThis header pipe is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next.

Contact Number:
Product Details

Header Pipe for Yamaha Ténéré 700: Low Maintenance Version

This header pipe is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the low maintenance version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Header Pipe for Yamaha Ténéré 700

Specification

PartHeader Pipe
FitmentYamaha Ténéré 700
VersionLow Maintenance Version
Base materialPVC Coated Fabric
Typical useCoastal Delivery
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time30-35 days after approval
ComplianceISO/TS 16949

What decides whether it lasts

  • Material — PVC Coated Fabric is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha Ténéré 700 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Header Pipe production

Processes used on this line

  • shot blasting
  • gravity casting
  • precision stamping
  • rubber vulcanisation
  • laser cutting
  • die casting

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The low maintenance version build is the one most often ordered for coastal delivery. Riders also fit it for wet weather riding, heavy load hauling, ride-hailing fleets, urban courier work.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top