Kickstart Lever for Kawasaki ZX-6R: Touring Version
This kickstart lever is built for the Kawasaki ZX-6R and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the touring version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Kickstart Lever |
|---|---|
| Fitment | Kawasaki ZX-6R |
| Version | Touring Version |
| Base material | Magnesium Alloy |
| Typical use | Ride-Hailing Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | ISO/TS 16949 |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki ZX-6R mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- precision stamping
- laser cutting
- electroplating
- assembly line testing
- robot welding
- ultrasonic cleaning
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The touring version build is the one most often ordered for ride-hailing fleets. Riders also fit it for track days, delivery fleets, rural transport, weekend riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







