Frame Slider for Beta RR 300: Racing Spec
This frame slider is built for the Beta RR 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the racing spec programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: premature wear on the first batch, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Frame Slider |
|---|---|
| Fitment | Beta RR 300 |
| Version | Racing Spec |
| Base material | Zinc Plated Steel |
| Typical use | Night Riding |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Beta RR 300 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- assembly line testing
- robot welding
- CNC machining
- gravity casting
- sintering
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The racing spec build is the one most often ordered for night riding. Riders also fit it for airport ground fleets, delivery fleets, night riding, passenger transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Ask for the current catalogue and the specification sheet for this line.







