Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Bearing for GasGas EC 250: Two-Piece Construction

Steering Bearing for GasGas EC 250: Two-Piece Construction

Steering Bearing for GasGas EC 250: Two-Piece ConstructionThis steering bearing is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next.

Contact Number:
Product Details

Steering Bearing for GasGas EC 250: Two-Piece Construction

This steering bearing is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a supplier who changed material without saying so, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Steering Bearing for GasGas EC 250

Specification

PartSteering Bearing
FitmentGasGas EC 250
VersionTwo-Piece Construction
Base materialSintered Metal
Typical useMining Sites
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceSGS

What decides whether it lasts

  • Material — Sintered Metal is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual GasGas EC 250 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Steering Bearing production

Processes used on this line

  • sintering
  • anodising
  • injection moulding
  • surface grinding
  • powder coating
  • cold forging

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for mining sites. Riders also fit it for security patrols, delivery fleets, mining sites, rural transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top