Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuse Box for Yamaha FZ16: Drilled and Slotted

Fuse Box for Yamaha FZ16: Drilled and Slotted

Fuse Box for Yamaha FZ16: Drilled and SlottedThis fuse box is built for the Yamaha FZ16 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Fuse Box for Yamaha FZ16: Drilled and Slotted

This fuse box is built for the Yamaha FZ16 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fuse Box for Yamaha FZ16

Specification

PartFuse Box
FitmentYamaha FZ16
VersionDrilled and Slotted
Base materialNatural Rubber
Typical usePassenger Transport
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-35 days after approval
ComplianceSGS

What decides whether it lasts

  • Material — Natural Rubber is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha FZ16 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fuse Box production

Processes used on this line

  • cold forging
  • rubber vulcanisation
  • heat treatment
  • powder coating
  • assembly line testing
  • electroplating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The drilled and slotted build is the one most often ordered for passenger transport. Riders also fit it for weekend riding, rental fleets, mountain roads, mining sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top