Air Filter for Hero Glamour: Drilled and Slotted
This air filter is built for the Hero Glamour and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Air Filter |
|---|---|
| Fitment | Hero Glamour |
| Version | Drilled and Slotted |
| Base material | Titanium Alloy |
| Typical use | Mountain Roads |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Titanium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Hero Glamour mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- injection moulding
- ultrasonic cleaning
- sintering
- robot welding
- die casting
- precision stamping
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The drilled and slotted build is the one most often ordered for mountain roads. Riders also fit it for motocross, urban courier work, rental fleets, airport ground fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







