Welcome to Auto, Motorcycle Parts & Accessories official website!
Drive Chain for Yamaha MT-15: Reinforced Build

Drive Chain for Yamaha MT-15: Reinforced Build

Drive Chain for Yamaha MT-15: Reinforced BuildThis drive chain is built for the Yamaha MT-15 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Drive Chain for Yamaha MT-15: Reinforced Build

This drive chain is built for the Yamaha MT-15 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the reinforced build programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: premature wear on the first batch, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Drive Chain for Yamaha MT-15

Specification

PartDrive Chain
FitmentYamaha MT-15
VersionReinforced Build
Base materialTitanium Alloy
Typical useConstruction Sites
MOQ1,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time30-60 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — Titanium Alloy is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha MT-15 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Drive Chain production

Processes used on this line

  • shot blasting
  • gravity casting
  • surface grinding
  • precision stamping
  • sintering
  • heat treatment

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The reinforced build build is the one most often ordered for construction sites. Riders also fit it for rental fleets, heavy load hauling, weekend riding, airport ground fleets.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top