Fuel Tank for BMW R1250GS: Vented Design
This fuel tank is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Fuel Tank |
|---|---|
| Fitment | BMW R1250GS |
| Version | Vented Design |
| Base material | Polypropylene |
| Typical use | Security Patrols |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-35 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Polypropylene is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual BMW R1250GS mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- ultrasonic cleaning
- electroplating
- rubber vulcanisation
- heat treatment
- surface grinding
- assembly line testing
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The vented design build is the one most often ordered for security patrols. Riders also fit it for off-road trails, urban courier work, rural transport, passenger transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







