Welcome to Auto, Motorcycle Parts & Accessories official website!
Foot Peg for Bajaj Boxer 150: Drilled and Slotted

Foot Peg for Bajaj Boxer 150: Drilled and Slotted

Foot Peg for Bajaj Boxer 150: Drilled and SlottedThis foot peg is built for the Bajaj Boxer 150 and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Foot Peg for Bajaj Boxer 150: Drilled and Slotted

This foot peg is built for the Bajaj Boxer 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Foot Peg for Bajaj Boxer 150

Specification

PartFoot Peg
FitmentBajaj Boxer 150
VersionDrilled and Slotted
Base materialHigh Density Foam
Typical useAdventure Travel
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time25-60 days after approval
ComplianceTUV

What decides whether it lasts

  • Material — High Density Foam is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Bajaj Boxer 150 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Foot Peg production

Processes used on this line

  • powder coating
  • surface grinding
  • rubber vulcanisation
  • cold forging
  • ultrasonic cleaning
  • heat treatment

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The drilled and slotted build is the one most often ordered for adventure travel. Riders also fit it for rural transport, track days, construction sites, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top