Brake Lever for Royal Enfield Himalayan: Vented Design
This brake lever is built for the Royal Enfield Himalayan and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a supplier who changed material without saying so, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Brake Lever |
|---|---|
| Fitment | Royal Enfield Himalayan |
| Version | Vented Design |
| Base material | EPDM Rubber |
| Typical use | Security Patrols |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — EPDM Rubber is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Royal Enfield Himalayan mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- shot blasting
- robot welding
- die casting
- precision stamping
- sintering
- anodising
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The vented design build is the one most often ordered for security patrols. Riders also fit it for farm use, off-road trails, mountain roads, coastal delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Ask for the current catalogue and the specification sheet for this line.







