Welcome to Auto, Motorcycle Parts & Accessories official website!
Valve Set for Yamaha FJR1300: Upgraded Version

Valve Set for Yamaha FJR1300: Upgraded Version

Valve Set for Yamaha FJR1300: Upgraded VersionThis valve set is built for the Yamaha FJR1300 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Valve Set for Yamaha FJR1300: Upgraded Version

This valve set is built for the Yamaha FJR1300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Valve Set for Yamaha FJR1300

Specification

PartValve Set
FitmentYamaha FJR1300
VersionUpgraded Version
Base materialSilicone
Typical useDelivery Fleets
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time30-60 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — Silicone is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha FJR1300 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Valve Set production

Processes used on this line

  • electroplating
  • gravity casting
  • heat treatment
  • powder coating
  • sintering
  • rubber vulcanisation

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The upgraded version build is the one most often ordered for delivery fleets. Riders also fit it for daily commuting, urban courier work, rental fleets, night riding.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top