Welcome to Auto, Motorcycle Parts & Accessories official website!
Clutch Plate for Honda Wave 110: High Performance

Clutch Plate for Honda Wave 110: High Performance

Clutch Plate for Honda Wave 110: High PerformanceThis clutch plate is built for the Honda Wave 110 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Clutch Plate for Honda Wave 110: High Performance

This clutch plate is built for the Honda Wave 110 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a supplier who changed material without saying so, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Clutch Plate for Honda Wave 110

Specification

PartClutch Plate
FitmentHonda Wave 110
VersionHigh Performance
Base materialPowder Coated Steel
Typical useTrack Days
MOQ500 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time30-35 days after approval
ComplianceSGS

What decides whether it lasts

  • Material — Powder Coated Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda Wave 110 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Clutch Plate production

Processes used on this line

  • laser cutting
  • ultrasonic cleaning
  • robot welding
  • shot blasting
  • CNC machining
  • heat treatment

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The high performance build is the one most often ordered for track days. Riders also fit it for delivery fleets, construction sites, adventure travel, security patrols.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top