Welcome to Auto, Motorcycle Parts & Accessories official website!
Roller Set for Suzuki GN125: Budget Line

Roller Set for Suzuki GN125: Budget Line

Roller Set for Suzuki GN125: Budget LineThis roller set is built for the Suzuki GN125 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Roller Set for Suzuki GN125: Budget Line

This roller set is built for the Suzuki GN125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a supplier who changed material without saying so, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Roller Set for Suzuki GN125

Specification

PartRoller Set
FitmentSuzuki GN125
VersionBudget Line
Base materialNeoprene
Typical useSecurity Patrols
MOQ1,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — Neoprene is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Suzuki GN125 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Roller Set production

Processes used on this line

  • anodising
  • powder coating
  • gravity casting
  • die casting
  • CNC machining
  • assembly line testing

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The budget line build is the one most often ordered for security patrols. Riders also fit it for track days, wet weather riding, mining sites, heavy load hauling.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top