Welcome to Auto, Motorcycle Parts & Accessories official website!
Kick Starter for SYM Jet 14: Two-Piece Construction

Kick Starter for SYM Jet 14: Two-Piece Construction

Kick Starter for SYM Jet 14: Two-Piece ConstructionThis kick starter is built for the SYM Jet 14 and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Kick Starter for SYM Jet 14: Two-Piece Construction

This kick starter is built for the SYM Jet 14 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Kick Starter for SYM Jet 14

Specification

PartKick Starter
FitmentSYM Jet 14
VersionTwo-Piece Construction
Base materialNatural Rubber
Typical useDelivery Fleets
MOQ500 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — Natural Rubber is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual SYM Jet 14 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Kick Starter production

Processes used on this line

  • robot welding
  • powder coating
  • sintering
  • laser cutting
  • assembly line testing
  • injection moulding

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for delivery fleets. Riders also fit it for delivery fleets, airport ground fleets, construction sites, rural transport.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top