Welcome to Auto, Motorcycle Parts & Accessories official website!
Headlight for GasGas EC 250: Upgraded Version

Headlight for GasGas EC 250: Upgraded Version

Headlight for GasGas EC 250: Upgraded VersionThis headlight is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Headlight for GasGas EC 250: Upgraded Version

This headlight is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Headlight for GasGas EC 250

Specification

PartHeadlight
FitmentGasGas EC 250
VersionUpgraded Version
Base materialNylon 66
Typical useRoadside Assistance
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time30-60 days after approval
ComplianceECE R90

What decides whether it lasts

  • Material — Nylon 66 is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual GasGas EC 250 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Headlight production

Processes used on this line

  • shot blasting
  • cold forging
  • sintering
  • powder coating
  • surface grinding
  • CNC machining

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The upgraded version build is the one most often ordered for roadside assistance. Riders also fit it for daily commuting, night riding, roadside assistance, wet weather riding.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top