Motorcycle Tire for TVS HLX 125: Two-Piece Construction
This motorcycle tire is built for the TVS HLX 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: reorders that did not match the approved sample, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Motorcycle Tire |
|---|---|
| Fitment | TVS HLX 125 |
| Version | Two-Piece Construction |
| Base material | Carbon Fibre Composite |
| Typical use | Daily Commuting |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Carbon Fibre Composite is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS HLX 125 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- electroplating
- gravity casting
- heat treatment
- ultrasonic cleaning
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The two-piece construction build is the one most often ordered for daily commuting. Riders also fit it for security patrols, adventure travel, heavy load hauling, wet weather riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







