Cylinder Kit for Yamaha FJR1300: Load Rated Version
This cylinder kit is built for the Yamaha FJR1300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the load rated version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Cylinder Kit |
|---|---|
| Fitment | Yamaha FJR1300 |
| Version | Load Rated Version |
| Base material | Forged Aluminium |
| Typical use | Rural Transport |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-35 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Forged Aluminium is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha FJR1300 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- laser cutting
- ultrasonic cleaning
- gravity casting
- die casting
- surface grinding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The load rated version build is the one most often ordered for rural transport. Riders also fit it for delivery fleets, wet weather riding, rural transport, off-road trails.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







